Engineering firm Project management software for engineering firms

An engineering assignment does not look like a software project. It moves forward in standard phases, it produces indexed documents, it waits for approvals that condition what follows, and it is often shared with joint contractors. Project management software for an engineering firm has to hold these four realities, or it becomes a schedule that nobody opens.

The problem

What breaks in an engineering firm.

Four situations specific to the trade, and the third is the most costly.

The approval milestone that slips

A phase cannot close until the project owner has approved. The delay comes from their side, it shows up on yours, and nothing establishes where it comes from.

Rework between revision indices

A document goes through one index, then another. The time spent redoing it was not in the contract, and nobody counts what comes from a change of request.

The joint contractor who does not report

A work package entrusted to a partner whose only reporting is a monthly email. You commit its output to the project owner without seeing it.

Phasing that hides time spent

The next phase starts while the previous one drags on. Time entries get mixed, the gap by phase becomes impossible to calculate, and the assignment looks healthy until the last phase.

The tool landscape

Why the tools on the market are not enough here.

Task management tools ignore the notion of a conditional phase: for them, a task is done or it is not, and nothing says that an entire phase is waiting for the agreement of a party outside the organization.

An engineering assignment is set apart by something few tools model: a phase can be technically finished and administratively open, because it is waiting for an external approval. Meanwhile, the team has started the next one, and time entries get mixed. It is this overlap, more than the production itself, that makes the gap by phase so hard to establish.

Trade-specific tools, for their part, handle technical production and document indices perfectly well. What they do not carry is the commitment made to the project owner and to the joint contractors: what was promised, by what date, and who is blocking what today.

It is this zone, between production and the contractual relationship, that we call operational commitment management.

In practice

In pylotik.

Three points that answer the situations above.

The project owner's delay is dated

An expected approval is a line with a deadline and an owner, closed by whoever requested it. See contractual commitment tracking.

Joint contracting fits the same framework

Management applies in both directions of the contractual link: what you open to the project owner, your joint contractor opens to you.

Time spent is tied to the phase

The gap is calculated by phase and not only by assignment, which shows which one absorbs the margin. See fixed-price tracking.

The record time-stamped at each committee also makes it possible to establish what the state of an assignment was on a given date, which matters when a rework is discussed several months later. The full tour is on the product page, and the contract modes on the commitment levels.

Frequently asked questions

What we are asked in engineering firms.

Do you manage the standard phases of an assignment?

Phases are modeled as work packages with their milestones and their conditions for moving on. pylotik does not know the trade reference frameworks of your sector: it knows dated commitments, and a phase is one.

Do you replace our technical production tools?

No, and it would be a bad idea: these tools carry formats, standards and working habits that no general-purpose tool replaces. Production, documents and their indices therefore stay with you. We carry what surrounds them: commitments, committees, approvals and gaps.

How do I trace a delay that comes from the project owner?

By making the expected approval a line of the project, with a deadline and an owner on the client side. Missing it becomes a dated fact rather than a feeling to argue at the end of the assignment.

What about joint contractors?

They fit the same system, the other way around: you are their client, and they open to you access to what concerns you. Access is free on both sides.

Where do the delays on your last assignment come from?

Describe an ongoing assignment to us, its phases and its expected approvals. We show you what would be dated, and on which side.